Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

******* ********** **************** ************* ****** ******
******* ******* Hier Werbebanner Google Adsense ******* *******
******* ********** **************** ************* ****** ******

Lift-Database » Lifts in the world

  3-CLF Chaz Dura

driving station
driving station

General information  
Place La Thuile 
resort ?? 
Region Valle d'Aosta 
Country   
Name of lift Chaz Dura 
Type 3-CLF 
Lift manufacturer Leitner 
Year of construction 1985 
Commissioning date ?? 

******* ********** **************** ************* ****** ******
******* ******* Hier Werbebanner Google Adsense ******* *******
******* ********** **************** ************* ****** ******

Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2301 m
Height of middle station(s) ?? m
Height of mountain station 2576 m
Vertical rise 275 m
Route distance 1056 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time ?? min
Driving speed line ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive hydraulic 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s

******* ********** **************** ************* ****** ******
******* ******* Hier Werbebanner Google Adsense ******* *******
******* ********** **************** ************* ****** ******

rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m


Warning: Undefined array key "AUTONOMOUSROPEWAY" in /www/htdocs/w00bac1b/core/lifts/lift_details.inc.php on line 743
miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 
Warning: Undefined array key "HTTP_ACCEPT_LANGUAGE" in /www/htdocs/w00bac1b/LiftWorld/Format/DateAndTime.php on line 57

Deprecated: locale_accept_from_http(): Passing null to parameter #1 ($header) of type string is deprecated in /www/htdocs/w00bac1b/LiftWorld/Format/DateAndTime.php on line 57
4 dec 2015
PHOTOS: ??
Warning: Undefined array key "HTTP_ACCEPT_LANGUAGE" in /www/htdocs/w00bac1b/LiftWorld/Format/DateAndTime.php on line 57

Deprecated: locale_accept_from_http(): Passing null to parameter #1 ($header) of type string is deprecated in /www/htdocs/w00bac1b/LiftWorld/Format/DateAndTime.php on line 57

Warning: Undefined array key "HTTP_ACCEPT_LANGUAGE" in /www/htdocs/w00bac1b/LiftWorld/Format/DateAndTime.php on line 57

Deprecated: locale_accept_from_http(): Passing null to parameter #1 ($header) of type string is deprecated in /www/htdocs/w00bac1b/LiftWorld/Format/DateAndTime.php on line 57


Lift-Statistics
1143 visit(s) since 16 nov 2004
Last visit 28 mrt 2026

LIFT-WORLD IDs
Lift-ID: 4473
Place-ID: 1434

https://www.seilbahntechnik.net/en/lifts/place/la_thuile/chaz dura--4473/datas